Goodrich Ejection Seat Mfg Facility

Completed: March 2008

This project was a fast-paced job done inside the Goodrich Manufacturing Facility.  It included 20’ high demising walls around the outside and open space inside with four conference rooms.  There was a need for natural light, so windows had to be cut into the existing exterior walls.  This required x-rays to locate the steel before we could saw cut through for the windows.  This project was completed within the allotted time frame and under the owner’s budget.

Unfortunately, due to the high security of the facility, we are unable to provide pictures of this project.